City Hall HVAC System Upgrades
The CIP project, 04-08, funded in FY 14/15 called for replacement of aging HVAC components including air conditioning units and heating hot water boiler, and repair of existing temperature controls. Upon initiation of design, it was discovered that additional work should be completed to operate the City Hall HVAC system efficiently if it is expected to remain in service for 10 or more years.
The project included upgrades to the existing City Hall building HVAC system, including related demolition, electrical and structural work. The scope included replacement of existing air handler and return air fans with new air conditioning units, re-balance of air distribution system, replacement of heating hot water boiler and pump, installation of a direct digital control (DDC) panel and providing temporary cooling or heating as needed.
Project Estimates | Prior Appropriations |
2017/18 Budget | 2018/19 Planned | 2019/20 Planned | 2020/21 Planned | 2021/22 Planned | Total |
City Hall HVAC System Upgrades | $751,891 | - 0 - | - 0 - | - 0 - | - 0 - | - 0 - | $751,891 |
Funding Sources | |||||||
Equipment Replacement Fund | $500,000 | - 0 - | - 0 - | - 0 - | - 0 - | - 0 - | $500,000 |
CIP | $251,891 | - 0 - | - 0 - | - 0 - | - 0 - | - 0 - | $251,891 |