Annual Concrete Repair

Project ID: 
TS-01005
Project Category: 
Pedestrian and Bicycle Safety
Project Status: 
In Design or Study
Project Priority: 
Health & Safety
Project Lead: 
V. Chen
Year Adopted:
Annual Project
Target Completion Date:
Aug 2021
Citywide

The annual concrete sidewalk repair project is intended to address the highest priority repair locations. The primary focus is on the replacement of damaged sidewalks that represent hazards to pedestrians. Staff continually receive complaints from residents regarding cracks or uplifted sidewalks that could cause a “trip and fall” type accident.

This project provides for replacement of cracked or uplifted sidewalks throughout the City that cannot be patched or ground down.

Project Estimates Prior
Appropriations
2020/21 Budget 2021/22 Planned 2022/22 Planned 2023/24 Planned Total
Concrete Repair $0 $200,000 $200,000 $200,000 $200,000 $800,000
Funding Sources
CIP $0 $200,000 $200,000 $200,000 $200,000 $800,000

 

 

 

 

Annual Concrete Repair
Annual Concrete Repair - Survey Markings