Projects

Format: 2016
Title Adoption Year Target Completion Date Category Status Address
Annual Concrete Repair 2016 In the year adopted Pedestrian and Bicycle Safety Ongoing
Annual Street Resurfacing 2016 September 2016 Streets and Roadways Ongoing
Annual Street Striping 2016 In the year adopted Streets and Roadways Ongoing
City Hall Roof Replacement 2016 June 2017 Building Not Started
1 N San Antonio Road
Los Altos, CA
El Monte Avenue Sidewalk Gap Closure 2016 October 2017 Pedestrian and Bicycle Safety Not Started
Los Altos, CA
El Monte/Springer Intersection Improvements 2016 December 2019 Pedestrian and Bicycle Safety Not Started
Los Altos, CA
First Street Streetscape Design Phase II 2016 June 2017 General Not Started
First Street (Main St. to San Antonio Rd.)
Los Altos, CA
Foothill Expressway Median Trees 2016 June 2017 General Not Started
Foothill Expressway (San Antonio Rd. to W. Edith Ave.)
Los Altos, CA
Lincoln Park Utility Undergrounding 2016 2021/22 Infrastructure Not Started
W. Edith Avenue & University Avenue
Los Altos, CA
Miramonte/Berry Crosswalk Improvements 2016 April 2017 Pedestrian and Bicycle Safety Not Started
Los Altos, CA
Park Hydration Station Installation 2016 In the year adopted Parks and Trails Not Started
1253 Fremont Ave
Los Altos, CA
Public Arts Master Plan 2016 In the year adopted General Not Started
San Antonio Road & West Portola Avenue Improvements 2016 June 2018 Pedestrian and Bicycle Safety Not Started
Los Altos, CA
Street Slurry Seal 2016 In the year of cycle Streets and Roadways Ongoing
Traffic Sign Replacement 2016 Annual In the year adopted Pedestrian and Bicycle Safety Ongoing
University Ave. & Lincoln Ave. Crosswalk Improvements 2016 April 2017 Pedestrian and Bicycle Safety Not Started
Los Altos, CA
Walter Singer Bust Relocation 2016 June 2017 General Not Started
51 S San Antonio Road
Los Altos, CA
Waterline Backflow Preventers 2016 December 2017 Building Not Started
Annual ADA Improvements (Facilities) 2015 Ongoing Building Not Started
Annual ADA Improvements (Streets & Roadways) 2015 Annually Streets and Roadways Not Started
Annual Pathway Rehabilitation 2015 Ongoing Parks and Trails Not Started
Annual Storm Drain Improvements 2015 Ongoing Storm In Design or Study
Downtown Parking 2015 TBD General Not Started
Los Altos, CA
Downtown Plan 2015 Winter 2017 General Not Started
Foothill Expressway Improvements 2015 2017/18 Streets and Roadways Not Started
Foothill Expressway (El Monte Ave. to San Antonio Rd.)
Los Altos, CA
Fremont Avenue Pedestrian Bridge Feasibility Study 2015 December 2016 Streets and Roadways In Design or Study
Fremont Avenue Pedestrian Bridge
Los Altos, CA
Geographic Information Systems (GIS) Update 2015 July 2016 Sewer Ongoing
Illuminated Crosswalk Replacement 2015 December 2019 Pedestrian and Bicycle Safety Not Started
Los Altos, CA
IT Initiatives 2015 Annual Technology In Design or Study
Parking Plaza Driveway Approach Improvements 2015 September 2016 Streets and Roadways In Design or Study
Los Altos, CA
Sewer Root Foaming 2015 July 2016 Sewer In Design or Study
W. Edith/University Crosswalk Improvements 2015 December 2016 Pedestrian and Bicycle Safety Not Started
Los Altos, CA
City Alley Resurfacing 2014 In the year adopted Streets and Roadways In Design or Study
City Hall HVAC System Upgrades 2014 December 2016 Building In Design or Study
1 N San Antonio Road
Los Altos, CA 94022
Grant Park & Community Center Improvement Project 2014 December 2016 Building In Design or Study
1575 Holt Avenue
Los Altos, CA 94022
Grant Road Bicycle Lane 2014 Fall 2016 Pedestrian and Bicycle Safety Not Started
Miramonte Avenue Path 2014 FY 2017/18 Pedestrian and Bicycle Safety Not Started
Los Altos, CA
Plaza 3 Drive Aisle Improvements 2014 September 2016 Streets and Roadways In Design or Study
Los Altos, CA
Rubberized Cape Seal (Grant Road) 2014 August 2016 Streets and Roadways In Construction
Los Altos, CA
Sewer System Management Plan Update 2014 Ongoing Sewer Not Started
Citywide
Los Altos, CA 94022/94024
Silicon Valley Regional Interoperability Authority Project 2014 2017/18 Technology In Design or Study
Traffic Signal Improvements: San Antonio Rd/First St/Cuesta Dr 2014 February 2016 Pedestrian and Bicycle Safety Completed
Los Altos, CA 94022
Transportation Enhancements 2014 TBD Pedestrian and Bicycle Safety Not Started
Advanced Traffic Management Study 2013 December 2016 Pedestrian and Bicycle Safety Not Started
CIPP Corrosion Rehabilitation 2013 June 2018 Sewer Not Started
Citywide
Los Altos, CA 94022/94024
City Facilities Capital Recovery Projects 2013 Annual In the year adopted Building Ongoing
1 North San Antonio Road
Los Altos, CA 94022
Civic Center Redevelopment 2013 In the year adopted Building In Design or Study
1 North San Antonio Road
Los Altos, CA 94022
Commercial Wayfinding Sign Program 2013 June 2016 General In Design or Study
Los Altos, CA 94022
Covington Road Bicycle & Pedestrian Improvements 2013 Summer 2017 Parks and Trails Not Started
Covington Road (Miramonte to Blach Intermediate School)
Los Altos, CA 94022
Fats, Oils and Grease (FOG) Program 2013 Ongoing Sewer In Construction
Citywide
Los Altos, CA 94022/94024
First Street Resurfacing 2013 Fall 2016 Streets and Roadways Not Started
First Street (State St. to W Edith Ave.)
Los Altos, CA 94022
First Street South Plan Line 2013 TBD Streets and Roadways Not Started
Between Main Street & South San Antonio Road
Los Altos, CA 94022
Halsey House Renovation/Replacement 2013 2015/16 Building In Design or Study
Located within Redwood Grove
Los Altos, CA 94022
Neighborhood Traffic Management Plan (NTMP) 2013 TBD Pedestrian and Bicycle Safety Ongoing
Public Arts Projects 2013 Ongoing General Ongoing
Repair Maintenance Problem Areas 2013 Five Year Plan Sewer In Construction
Citywide
Los Altos, CA 94022/94024
Sewer Collection System Upgrade 2013 Spring 2014 Sewer Completed
Sewer System Repair Program 2013 Five Year Plan Sewer In Construction
South Sewer Replacement 2013 June 2018 Sewer Not Started
Structural Reach Replacement, PCR (a) 2013 Ongoing Sewer In Construction
Citywide
Los Altos, CA 94022/94024
Speed Zone Survey 2012 June 2016 Pedestrian and Bicycle Safety Ongoing
Annual Sewer Main Repairs 2011 Spring 2014 Sewer Completed
South Springer Road and El Camino Real
Los Altos, CA 94022
Fallen Leaf Lane Sewer Main Replacement 2011 Spring 2014 Sewer Completed
Fallen Leaf Lane at Fremont Avenue
Los Altos, CA 94024
Portola Avenue Sidewalk Project 2011 August 2014 Pedestrian and Bicycle Safety Completed
W. Portola Avenue
Los Altos, CA 94022
Collector Street Traffic Calming 2009 TBD Pedestrian and Bicycle Safety In Design or Study
First Street Utility Undergrounding Phase II 2009 September 2016 Infrastructure In Design or Study
First Street (from Main St. to San Antonio Rd.)
Los Altos, CA
Miramonte/Covington Pedestrian Improvements 2009 December 2015 Pedestrian and Bicycle Safety Completed
Los Altos, CA 94022
Police Records Management & Dispatch System 2008 June 2017 Technology In Construction
Fremont Avenue Bridge Replacement 2002 2016 Streets and Roadways Completed
Los Altos, CA 94024
City-wide Street Crack-sealing Project Jun/2015 Streets and Roadways In Construction
Grant Park Community Center Roof Replacement 2015/16 Building Completed
1575 Holt Ave
Los Altos, CA 94024
Intersection Bicycle Loops 2012/13 June 2016 Pedestrian and Bicycle Safety Completed
Past Year Projects Pre-2013 General Ongoing
Redwood Grove Bank Stabilization 2013/14 Oct/2015 Parks and Trails Completed
Los Altos, CA 94022