SOUTH SEWER MAIN REPLACEMENT - PHASE 2
DESCRIPTION:
This project provides for the replacement of 4,750 feet of existing 12-inch sewer pipe with new 15-inch and 18-inch sewer pipe. The project is identified as Project H1 and scheduled for FY 2010/2011 for Phase 2 in the Sewer Master Plan. The replacement will most likely be done using open trench methods.
COST SUMMARY:
| Design and Construction |
$ |
1,172,500 |
POTENTIAL FUNDING SOURCES:
| Sewer Enterprise Fund |
$ |
1,1,72,500 |
IMPACT ON ANNUAL MAINTENANCE AND OPERATION COSTS:
Maintenance costs should be reduced once the new mains are in place.
ALTERNATIVES:
None
|
|
|
| |