PORTOLA AVENUE SIDEWALK
DESCRIPTION:
On the south side of Portola Avenue just west of Egan Junior High School there is a 780-foot section of the street that has no sidewalk. This section of the street is a route used by the students at Egan School. Due to the lack of sidewalk in this section of the street, these students are forced to walk on or near the street in this section. This project will provide a new sidewalk with new curb and gutter that will connect to the existing sidewalk at each end of this section. This project was unsuccessful twice to be funded by Safe Routes to School grants.
COST SUMMARY:
| Design and Construction |
$ |
51,000 |
POTENTIAL FUNDING SOURCES:
| Development Impact Fees |
$ |
51,000 |
IMPACT ON ANNUAL MAINTENANCE AND OPERATION COSTS:
Maintenance costs should increase slightly due to the added sidewalk and curb.
ALTERNATIVES:
An alternative is to limit the size of the project or delete the curb. |
|
|
| |