Redwood Grove Bank Stabilization

Project ID: 
CF-01001
Project Category:
Project Status: 
Not Started
Project Priority: 
Asset Preservation
Expended to Date: 
- 0 -
Project Lead: 
D. Brees
Year Adopted:
2013
Target Completion Date:
2013/14
Redwood Grove Nature Preserve
482 University Avenue
Los Altos, CA 94022

Through a grant from the Santa Clara County Water District, the non-profit agency Acterra funded a bank stabilization plan to repair severe erosion along Adobe Creek adjacent to the footbridge within the Redwood Grove Nature Preserve. 

The conceptual plans were completed by the Urban Creeks Council and Restoration Design Group with input from City Engineering staff. The project consists of earthwork, drainage and soil bioengineering to repair the eroded areas using environmentally appropriate techniques and materials and preventing future erosion. Additionally the existing footbridge and boardwalk will be relocated and replaced with an ADA-accessible footbridge and boardwalk throughout the grove. Native plants will be protected and augmented and interpretive elements will be included for park users.

Project Estimates Prior
Balance
2013/14 2014/15 2015/16 2016/17 2017/18 Total
Redwood Grove Bank Stabilization - 0 - $372,000 - 0 - - 0 - - 0 - - 0 - $372,000
Funding Sources
Park In-Lieu Fees - 0 - $282,000 - 0 - - 0 - - 0 - - 0 - $282,000
State & Federal Grants - 0 - $90,000 - 0 - - 0 - - 0 - - 0 - $90,000

 

 

 

 

 

 

Redwood Grove Bank Stabilization